At the January 20th meeting of the Board of
Directors, new procedures and guidelines were
unanimously adopted for all modification
requests.
Procedure:
1. All modification requests are to be
submitted to Rampart, no later than the 1st of the month, in
order to be considered at the month's meeting.
2. Rampart will present proposals to the board members
at least 10 days before that months meeting.
3. Board members will look over the proposal
and, if necessary discuss the modification plans with
the homeowner prior to the meeting
4. If the request is approved at the board
meeting, the homeowner must obtain the required permits
and survey and submit these to Rampart before work is
started.
Follow-up:
Rampart will inspect the unit to verify that the
modification was done as originally approved. The
homeowner will assume full responsibility for all
maintenance of the modification. This
responsibility will be passed on to all subsequent unit
owners.
Guidelines:
All exterior doors must be white, either solid or with
glass inserts. Picture of proposed door is to be
presented with the Modification Request.
Glass/Screen Storm doors should be white
aluminum with black screening.
New private, individual fences will no
longer be permitted. Existing fences are to be
maintained and repaired by the homeowner.
All exterior lights, if replaced by
owners, must be white and the size/shape should be in
keeping with the rest of the building.
Front entrance roofs must be white vinyl
or aluminum and light fixtures should be standard white.
Lanais must have a white frame with a
kick plate no more than 24" from the bottom and all
screens should be black. Lattice is acceptable but
must be white vinyl with the larger latticework and can
be any height provided it starts at the
bottom of the screening.
The unit owner will maintain all lattices.
Lanai conversions or additions must be
white aluminum with Willow Greens yellow/white trim.
Only hurricane code glass or vinyl windows will be
allowed. There will be no outside,
through-the-wall, or window air conditioning units will
be permitted. Permits must be obtained from the
City of Largo before any work is begun.